The following pre-flight checklist has been prepared. - Load 2 ejections charges for drogue/Pilot - 2g (2 scoops) - Load 2 ejections charges for tether - .2g - assemble tether and tape and attach to lower retention u-bolt - fish ejectionwires down to holes for altimeters and silly putty and tape opening s - Check main parachute bridle connections to nose cone and main airframe - Pack main recovery system - place main protection shield - lay apogee event charges on top of Main protection - place apogee protection shield - Check drogue parachute bridle connections to motor section and main airframe - Pack drogue recovery system and install Nose Cone - Replace batteries and test altimeters - fish power wires thru vent hole - Install altimeters into payload bays - Wire electric matches to altimeters - Install retaining screws for altimeter bays - Build AMW 76mm M1350WW reload as per instructions - Install motor into rocket with retainer - Prepare igniter and make sure it will fit into motor - Tape igniter to airframe - Check in with RSO, turn in flight card - Load onto Rail - Turn on Perfectflite #1 and verify continuity (three beeps) - Turn on Perfectflite #2 and verify continuity (three beeps) - wrap power wires with tape and push back thru vent hole - Install igniter, connect to launch system and verify continuity - Return behind flight line - Get camera and wait for launch